How many hectare meter/hour in 1 cubic yards per day? The answer is 3.1856452875E-6. We assume you are converting between hectare metre/hour and cubic yard/day. You can view more details on each measurement unit: hectare meter/hour or cubic yards per day The SI derived unit for volume flow rate is the cubic meter/second. 1 cubic meter/second is equal to 0.36 hectare meter/hour, or 113006.93188052 cubic yards per day. Note that rounding errors may occur, so always check the results. Use this page to learn how to convert between hectare meters/hour and cubic yards/day. Type in your own numbers in the form to convert the units!
1 hectare meter/hour to cubic yards per day = 313908.14411 cubic yards per day
2 hectare meter/hour to cubic yards per day = 627816.28823 cubic yards per day
3 hectare meter/hour to cubic yards per day = 941724.43234 cubic yards per day
4 hectare meter/hour to cubic yards per day = 1255632.57645 cubic yards per day
5 hectare meter/hour to cubic yards per day = 1569540.72056 cubic yards per day
6 hectare meter/hour to cubic yards per day = 1883448.86468 cubic yards per day
7 hectare meter/hour to cubic yards per day = 2197357.00879 cubic yards per day
8 hectare meter/hour to cubic yards per day = 2511265.1529 cubic yards per day
9 hectare meter/hour to cubic yards per day = 2825173.29701 cubic yards per day
10 hectare meter/hour to cubic yards per day = 3139081.44113 cubic yards per day
You can do the reverse unit conversion from cubic yards per day to hectare meter/hour, or enter any two units below:
ConvertUnits.com provides an online conversion calculator for all types of measurement units. You can find metric conversion tables for SI units, as well as English units, currency, and other data. Type in unit symbols, abbreviations, or full names for units of length, area, mass, pressure, and other types. Examples include mm, inch, 70 kg, 150 lbs, US fluid ounce, 6'3", 10 stone 4, cubic cm, metres squared, grams, moles, feet per second, and many more!